OVERVIEW:
Ben Fleur was looking to reduce their dependency on the national grid through a 10-year Power Purchase Agreement (PPA). The system was designed to offset 40% of the centres electricity costs.
SIZE: 795 kWp
SAVINGS:
Reduced energy requirement from the national grid to curb the rising costs of electricity
Bulk electricity supply to buy power at a cheaper rate
ENERGY SECURITY: Decentralised generator system
MOUNT: Rooftop